Skip to main content
Loading…
This section is included in your selections.

When new buildings are to be erected on the site of the old ones and it is desired to increase the size or change the location of the old service connection, or where a service connection to any premises is abandoned or allowed to be shut off for a period of one year, the superintendent may cut out or remove such service connection, after which, should a service connection be required to said premises, a new service shall be placed only upon the owner making an application and paying for a new tap and service in the regular manner. But any change made in tap shall be made from nearest point on property line.

Prior to the adoption of 6497 on 03/24/2010, Section 13.56.160 read as follows.

When new buildings are to be erected on the site of the old ones and it is desired to increase the size or change the location of the old service connection, or where a service connection to any premises is abandoned or allowed to be shut off for a period of one year, the superintendent may cut out or remove such service connection, after which, should a service connection be required to said premises, a new service shall be placed only upon the owner making an application and paying for a new tap in the regular manner. But any change made in tap shall be made from nearest point on property line. (Prior code § 10.18.140)

(Ord. 6497, Amended, 03/24/2010)