A. The developer will submit to the city a proposed construction schedule ten (10) days prior to commencing construction. The city engineer shall conduct inspections and file reports for periodic inspections necessary during construction of storm and surface water management systems to ensure compliance with the approved plans. The developer shall notify the city upon completion of the project when a final inspection will be conducted.

B. Any portion of the work which does not comply with city regulations will be promptly corrected by the developer, after written notice from the city. The notice shall set forth the nature of corrections required and the time within which corrections will be made.

C. A final inspection shall be conducted by the city upon completion of the elements of the storm and surface water drainage plan to determine if the completed work is constructed in accordance with the approved plan and this chapter. The developer shall supply an “as-built” certification by a registered professional engineer licensed in the state of Washington to certify that the facility has been constructed as shown in the “as-built” plans and meets approved plans and specifications. The city will provide the developer with a written notification of the results of the final inspection.

(5/23/2018 amend; Ord. 6503, Added, 08/25/2010)