A. All inspection and permit fees shall be paid prior to connection by the serving utility. Electrical power connections to a mobile home shall not be made by the serving utility until an inspection of the tie-down installation has been made and approval given by the city building department. All inspection requests shall be made twenty-four (24) hours in advance.

B. Inspection fees shall be as established by Chapter 296-46B WAC, provided that double fees will be charged for:

1. Installations that are covered or concealed before inspection.

2. Failure to obtain a permit prior to beginning the installation or alteration, or failure to obtain permits for emergency repairs to existing by the next business day after beginning the emergency repairs.

Prior to the adoption of 6363 on 07/28/2004, Section 15.36.100 read as follows.

A. All inspection and permit fees shall be paid prior to connection by the serving utility. Electrical power connections to a mobile home shall not be made by the serving utility until an inspection of the tie-down installation has been made and approval given by the city Building Department. All inspection requests shall be made twenty-four (24) hours in advance.

B. Inspection fees shall be as established by chapter 296-46A WAC, provided that double fees will be charged for:

1. Installations that are covered or concealed before inspection.

2. Failure to obtain a permit prior to beginning the installation or alteration, or failure to obtain permits for emergency repairs to existing by the next business day after beginning the emergency repairs.

Prior to the adoption of 6287 on 05/02/2001, Section 15.36.100 read as follows.

A. All inspection and permit fees shall be paid prior to connection by the serving utility. Electrical power connections to a mobile home shall not be made by the serving utility until an inspection of the tie-down installation has been made and approval given by the city Building Department. All inspection requests shall be made twenty-four (24) hours in advance. B. Inspection fees for electrical permits shall be as established by WAC 296-46.910 (Note: WAC 296-46-910 is adopted by reference in AMC 15.36.010), provided that double fees will be charged for:

1. Installations that are covered or concealed before inspection.

2. Failure to obtain an electrical work permit prior to beginning the installation or alteration.

Exception: Electrical work permits for emergency repairs to existing electrical systrems shall be obtained the next business day.

(Ord. 6639 § 9, Renumbered, 12/12/2018; Ord. 6363, Amended, 07/28/2004; Ord. 6287, Amended, 05/02/2001; Ord. 6159, Amended, 08/06/1997. Formerly 15.36.100)