A. Design and conduct new mining and associated uses to result in no net loss of shoreline ecological functions and processes.

B. Do not locate new mining on shorelines where unavoidable adverse impacts on other users or resources taken together equal or outweigh the benefits from mining.

C. Minimize the impacts of mining, such as aesthetics, dust, noise, etc., on existing public access points and water-dependent or enjoyment uses.

D. Begin land reclamation immediately after the termination of mining operations. Use of reclaimed mine property must be consistent with the SMP and provide appropriate ecological functions consistent with the location and Washington State Surface Mining Reclamation Act requirements.

(Ord. 6611 § 1, Amended, 08/09/2017)