A. Building over a natural stream that is located in an underground pipe or culvert, except as allowed in Section 14.100.530(A) through (M) for transportation or utility crossings, is prohibited. Relocation of the piped stream system around structures is allowed. The relocated system shall be sized to convey the one hundred (100) year future land use condition runoff from the total upstream tributary area as determined from a hydrologic and hydraulic analysis performed in accordance with standards determined by the city.

B. No riparian buffers are required along segments of piped or culverted streams unless designated by the city for removal. Any easements or setbacks from pipes or culverts shall be consistent with adopted city regulations or design standards as administered by the city public works department. Setback requirements will include an easement over the piped stream system and a building setback from the edge of the easement. The city will determine the setback requirement during the permit review process. The setback size will be dependent upon the required amount of space that would be needed for maintenance, operation and future replacement of the piped stream system.

(Ord. 6673 § 1, Amended, 07/28/2021; Ord. 6474, Added, 02/25/2009)